Contractor profile
Services, approach, equipment and contacts in one document.
Open documentAstana and all of Kazakhstan · Commercial and industrial facilities
From an agreed technical brief to recommendations for continued operation. You receive a clear report on completed work.
Get a list of required work and documentsContract · Technical brief / appendix
Completion certificate · Ventilation cleaning report · Disinfection report, where performed
Before/after photos · Video report · Video inspection results · Verification measurements
Laboratory reports · Surface swabs / air testing · Laboratory credentials
Recommendations · Maintenance schedule
The document list depends on the work performed and the requirements of the specific facility.
Applicable requirements and the scope of work are determined for each facility.
What the regulation coversSanitary and epidemiological requirements for disinfection of ventilation and air conditioning systems.
What is needed and what we doInspection, cleaning and disinfection according to the agreed scope.
What the client receivesReports, photos/videos and laboratory results where testing is performed.
What the regulation coversSanitary and epidemiological requirements for healthcare facilities.
What is needed and what we doWe determine the work according to room use and system design.
What the client receivesCompleted-work documentation and laboratory reports where testing is performed.
What the regulation coversFire safety requirements applicable to the facility's systems.
What is needed and what we doWe inspect and remove combustible deposits from the agreed ventilation sections.
What the client receivesCleaning report, photographic record and maintenance recommendations.
Resources to prepare an enquiry, compare proposals and agree deliverables.
Services, approach, equipment and contacts in one document.
Open documentInput for an inspection and estimate. Complete and save as PDF.
Open documentSections to agree before work starts. Demonstration template without client data.
Open documentThe document set depends on the completed scope and the requirements of each facility.
We will propose a solution.